Blog Layout

LaSalle County CH 15/CH 4 Intersection

websitebuilder

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

LaSalle County CH 15/CH 4 Intersection

HEI was selected by the LaSalle County Highway Department to provide preliminary engineering services for the Highway Safety Improvement Program (HSIP) project at the intersection of CH 15 and CH 4 north of Marseilles. The CH 15 and CH 4 intersection project is a two-way stop-controlled intersection which has been the sight of multiple fatal crashes. HEI assisted LaSalle County in preparing a successful HSIP application by performing a traffic study and crash analysis. Once HSIP funding was granted HEI performed Phase I and Phase II engineering services. The scope of work included investigation and preliminary design of a rural roundabout. Due to funding restrictions a lower cost option was also investigated and ultimately chosen. The chosen option included radius widening, intersection lighting, raised medians on the stop-controlled legs and installation of flashing “Stop” and “Cross Traffic Does Not Stop” signs. 


By City of Moline, Illinois 01 Dec, 2023
Phase I and II design engineering services for this $2.0M MFT/Rebuild Bond funded, 1200’ long residential street reconstruction project.
By City of Washington, Illinois 01 Dec, 2023
HEI was selected by the City of Washington to provide preliminary and construction engineering services including preparation of plans, specifications, estimates and full construction oversight for the construction of a recreational trail along Cruger Rd.
By websitebuilder 07 Mar, 2022
HEI was selected by Peoria County to provide construction engineering services for the reconstruction of ½ mile of Old Galena Road, and 1000 FT of Cedar Hills Dr. This project consisted of pavement removal, storm sewer installation, 5 lanes of PCC jointed pavement, curb and gutter, medians, full depth asphalt and new traffic signals. Communication with the adjacent Caterpillar facilities was critical as construction activities and evolving traffic patterns affected their employees daily.
By websitebuilder 07 Mar, 2022
HEI was selected by the Illinois Department of Transportation - District 6 to provide design engineering services to expand this complex three mile three-lane urban section to a five-lane urban section with shoulders to accommodate bicycle lanes.
Show More
Share by: