River Road Bridge over Blackberry Creek

Hutchison Engineering, Inc. was selected by the Kendall County Highway Department to provide Phase I and Phase II preliminary engineering services for the replacement of the bridge carrying River Rd. over Blackberry Creek in Yorkville, IL. The project was located adjacent to a historic dry laid, quarried limestone dam. The east and west abutments of the bridge abutted the dam. When the project was originally envisioned it was anticipated the dam was going to be removed by the US Army Corp of Engineers prior to the bridge replacement project. Therefore, the existing two-span closed abutment structure was scheduled to be replaced with a new three span structure with open abutments. However, in June 2011 a large crack in the west masonry abutment was discovered and the roadway was closed. To expedite replacement of the structure the design was changed to a single span closed abutment structure to allow bridge replacement to proceed independent to the dam removal schedule. As the design of the project neared completion the Illinois Department of Natural Resources (IDNR) made a decision to take over the dam removal project and expedite their project concurrent to the bridge work. This caused a significant amount of coordination with the IDNR and plan modifications were required to ensure the bridge project could be a stand-alone project while not inhibiting and the dam removal project. The final design of the new structure consisted of a single span steel beam bridge, 99 feet in length and 34 feet in width. Construction of this approximately $1.5 million bridge and dam removal project was completed in 2013.

By Fulton County Highway Department, Illinois 02 Dec, 2023
HEI provided an initial survey and design for the emergency embankment repair of the existing slope wall along CH 2 near Bernadette, IL for the Fulton County Highway Department. The project consisted of removing the fore slope, benching slope, installing a pipe underdrain system, reconstructing fore slope and other collateral work.
By Knox County Highway Department, Illinois 02 Dec, 2023
HEI was utilized as a sub-consultant by the Knox County Highway Department to provide structural engineering services including preliminary bridge design and hydraulic report, permitting, development of plans, specification and estimates for two culvert locations. The culvert replacements were part of a 4-mile reconstruction of CH 4. Both culvert locations are carrying tributaries of Walnut Creek under CH 4. The designs consisted of cast-in-place, reinforced concrete, and multi-cell box culverts.
By Woodford County, Illinois 02 Dec, 2023
HEI provided Phase I and Phase II services for the reconstruction and realignment of CH 1 and CH 11 in Woodford County from CH 2 to IL Rte. 89. The reconstruction consisted of a new horizontal and vertical alignment with 12” aggregate base course, 6” HMA pavement, aggregate shoulders, culverts, and other collateral improvements. Due to the use of federal funding, the HEI staff had to coordinate with IDOT to produce PS&E for a state letting.
By LaSalle County Highway Department, Illinois 02 Dec, 2023
HEI was selected by the LaSalle County Highway Department to provide preliminary engineering and construction oversight services for the replacement of two multi-barrel box culverts in Streator, IL. Both culverts are located on Prairie Creek one carrying Bazore Street and the other carrying Division Street.
By Knox County, Illinois 02 Dec, 2023
HEI was selected by Knox County to provide preliminary engineering and material testing services including the preparation of a project development report, plans, specification, estimates, and nuclear density testing for the bridge replacement and roadway realignment on CH 11.
By Plainfield Township Highway Department, Illinois 02 Dec, 2023
HEI was selected by the Plainfield Township Highway Department to provide preliminary engineering and construction oversight services for a new bridge on a new alignment carrying Renwick Rd. over the DuPage River. The project is undertaken to provide a modern bridge that can meet current geometric policies and provide the desired load carrying capacities.
By Village of Plainfield, Illinois 02 Dec, 2023
HEI was selected by the Village of Plainfield to provide preliminary engineering including preparation of plans, specification and estimates for widening of the IL Rte. 126 (Lockport St.) bridge over the DuPage River to provide a pedestrian crossing. The pedestrian crossing connects the existing shared-use path west of the river to the Village’s Downtown Historic District and is the initial component of the Village’s riverfront development plan.
By LaSalle County Highway Department, Illinois 02 Dec, 2023
HEI was selected by the LaSalle County Highway Department to provide preliminary engineering services for the replacement of the bridge carrying CH 23 (Ed Hand Highway) over the Vermilion River near Oglesby, IL. Ed Hand Highway is a vital link from the City of Oglesby to Matthiessen State Park, Starved Rock State Park, and the Village of Utica.